In the North of Ost colliery in Germany there is a roadway in a depth of 1.000
metres between the shafts Radbod 5 and Radbod 6. This roadway could be the basis
for the planned Donar colliery that would extract about 100 million tons of high
quality coking coal that can be found in the deposits of that region. A large
Pro-Bergbau gallery about Radbod 5 shaft can be found
if you click here.
|